Residential site plan showing proposed ADU placement on a Raleigh NC property with boundaries, access and utility context
Site Plan • Placement

ADU Site Plan Preparation Raleigh NC

An ADU site plan shows how the proposed accessory dwelling unit fits the property — the boundaries, the existing home, the proposed ADU, the access, the utilities and the drainage. It is the document that places the ADU on the lot and confirms it fits within the setbacks.

ADU Site Plan Preparation

Site plan preparation for Raleigh ADU projects — showing the proposed ADU's relationship to property boundaries, the existing home, access, utilities, drainage and setbacks.

Service AreaRaleigh & Triangle
Direct Line984-317-5885
01 — Site Plan

Showing How the ADU Fits the Property

A site plan is the drawing that places the ADU on the property. It shows the lot boundaries, the existing home, the existing garage or outbuildings, the proposed ADU, the driveway and access, the utility context and the distances that confirm the unit sits within the setbacks. In homeowner terms, it is the map of the project on the land.

A site plan is not a floor plan and not a survey. The floor plan shows the interior of the ADU; the survey measures the property; the site plan shows how the ADU relates to the property and the existing structures. For an ADU permit, the site plan is typically required to confirm the placement complies with setbacks, lot coverage and access rules.

The site plan is where the ADU meets the lot. A design that works on a floor plan can fail on a site plan if the footprint does not fit the buildable area, if the access does not work or if the utilities cannot reach the structure. The site plan confirms the design is buildable on the parcel.

02 — Contents

Information a Site Plan May Show

The information a site plan shows depends on the project, the jurisdiction and the available property data. The following are the categories that may be included, based on verified property information.

  • Property boundaries — the lot lines and dimensions
  • Existing home — the primary residence footprint and its relationship to the ADU
  • Existing structures — garage, shed or outbuilding that may be converted, removed or remain
  • Proposed ADU — the footprint, placement and orientation of the new or converted unit
  • Driveway and access — the existing or proposed path from the street to the property
  • Utility context — water, sewer, electrical and gas routing to the ADU
  • Site features — trees, drainage, slopes or other conditions that affect placement
  • Distances and dimensions — where based on verified property data, the setbacks to boundaries

We do not fabricate survey measurements

A site plan uses verified property data. Where precise boundary or elevation data is needed, we coordinate a survey or plot plan rather than estimating dimensions. A site plan with fabricated measurements fails at permitting.

03 — Placement

Why ADU Placement Matters

Where the ADU sits on the lot affects every part of the project — privacy, access, utilities, drainage and the relationship to the primary home. Placement is not a detail; it is a design decision that shapes the project.

  • Privacy — the ADU and the primary home each need privacy from the other and from neighbors
  • Construction access — equipment and materials have to reach the ADU site
  • Utilities — water, sewer and electrical runs follow the placement and affect cost
  • Drainage — the ADU must not create stormwater problems for the home or neighbors
  • Relationship to home — the ADU connects to or separates from the primary home based on placement
  • Outdoor space — the ADU's placement affects the yard, the patio and the landscape

A placement that looks good on a concept sketch can fail on a site plan. A unit placed too close to a boundary may violate a setback; a unit placed over a utility easement may conflict with services; a unit placed at the back of a deep lot may require long, expensive utility runs. The site plan tests the placement against the lot.

Want to know if your property qualifies?

Start with a parcel-specific feasibility review of your Raleigh or Triangle address.

Start With Feasibility
04 — Project Types

Site Plans for Different ADU Types

Different ADU types produce different site plans. A detached ADU is a new footprint on the lot; a garage conversion is an existing footprint with a change of use; a garage replacement is a new footprint where a structure used to stand.

Detached ADU

A new footprint in the backyard — setbacks, lot coverage and utility runs to the new structure.

Garage Apartment

A new or expanded footprint — the garage footprint plus the upper-level projection if any.

Garage Replacement

A new footprint where the old garage stood — demolition, new foundation and new utility connections.

Attached ADU

An expanded footprint — the addition's projection from the existing home and the setbacks to boundaries.

Outbuilding Conversion

An existing footprint with a change of use — access, utilities and life-safety upgrades to the existing structure.

The site plan matches the ADU type. A conversion site plan shows the existing footprint and the upgrades; a new-construction site plan shows the new footprint, the foundation and the utility runs. We prepare the site plan that fits the project.

05 — Accuracy

Survey Information and Site Plan Accuracy

A site plan is only as accurate as the property data behind it. Where existing survey information is available and current, the site plan can use it. Where the property data is outdated, incomplete or the lot has changed — a new addition, a demolished garage, a regraded yard — updated survey information may be needed.

We coordinate with survey information rather than producing it. Where a formal survey or plot plan is needed to confirm boundaries, elevations or easements, we flag it as a project step and integrate the survey data into the site plan.

06 — Next Steps

From Site Plan to Permit Documents

The site plan is one part of the permit submission. Once the placement is confirmed and the site plan is complete, it joins the floor plans, elevations, structural details and code notes in the full permit drawing set. The site plan confirms the placement; the permit set confirms the construction.

FAQ — ADU Site Plan Preparation

Common Questions About ADU Site Plan Preparation

In most Raleigh ADU projects, yes. A site plan shows how the proposed ADU fits the property — the boundaries, the existing home, the proposed placement, access, utilities and setbacks. The building department uses it to confirm the placement complies with zoning.

Start Your Project

Need a Site Plan for Your Raleigh ADU?

Tell us about your property and your ADU concept. We prepare the site plan that shows how the unit fits the lot — boundaries, access, utilities and setbacks.

Raleigh Property Feasibility

Request an ADU / In-Law Suite Consultation

Tell us about your property. We review Raleigh & Triangle zoning, setback and utility conditions.

A full address, street + city, neighborhood or just a city all work — enough context to start the conversation.